22 Compliance Group Logo - Outsourced Compliance Company

SOC 2

How Much Does SOC 2 Cost?

There is no single SOC 2 price. There are five cost categories, and the largest one usually never appears on an invoice.

By 22 Compliance Group Published Reviewed 8 min read

SOC 2 does not have a single price. It has five cost categories, and the largest one usually never appears on an invoice. Anyone quoting you one number for SOC 2 is quoting one component of it, and probably not the biggest.

Here is how to build a budget you can defend to a board, and where the estimates most often go wrong.

The five categories

1. Readiness

The work before an auditor arrives: scoping, gap assessment, policy development, control implementation, remediation management, and evidence organization. This can be done internally, by a consultant on a project basis, or by an ongoing partner.

The cost driver is not the framework. It is how much already exists. A company with documented infrastructure, some policies, and clear system ownership needs far less readiness work than one starting from a blank page, and no honest provider can quote it before looking.

2. Compliance software

A GRC platform subscription, if you use one. Pricing typically scales with headcount, integrations, and frameworks. Most platforms are annual commitments.

Worth being clear about what this buys: monitoring, evidence collection, templates, and structure. It is a real cost and a real benefit, and it is not a substitute for the readiness work above.

3. The independent audit

The examination itself, performed by an independent licensed CPA firm and billed by that firm. Cost varies with scope, the number of Trust Services Criteria in play, whether it is Type I or Type II, the length of the observation period, and the complexity of your environment.

This fee is separate from readiness work. The examining firm must maintain independence and cannot assume management responsibility for the controls it later examines.

4. Penetration testing and specialist services

Not universally required, but frequently expected by customers and sometimes needed to support specific controls. Scope determines cost, and it is a separate specialist engagement.

5. Internal effort

The category that never gets budgeted and is often the largest.

Engineering hours spent pulling evidence. A founder's time in auditor interviews. The delayed feature because your CTO spent three weeks on control documentation. Leadership time in review meetings. This does not appear on any invoice, which is exactly why it is underestimated.

If you want an honest comparison between doing this internally and bringing in help, this is the line that decides it.

What actually moves the number

  • Scope. How many Trust Services Criteria, systems, and entities are included. Overscoping is the most common and most expensive early mistake.
  • Starting maturity. Existing documentation, defined ownership, and stable infrastructure all reduce readiness effort.
  • Type I vs Type II. Different examinations, different evidence burdens, different fees.
  • Observation period length. Longer periods mean more sustained operation and more evidence.
  • Infrastructure complexity. More environments, more integrations, more surface area.
  • Timeline pressure. Compressed schedules cost more, in fees and in disruption.

The mistake that costs the most

Treating SOC 2 as a one-time purchase.

A report covers a stated period. The next one depends on controls having operated continuously since. Companies that treat the first report as the finish line pay something close to full readiness cost again the following year, because the program stopped running the week after the audit closed.

The second report should be substantially cheaper than the first. When it is not, that is a signal about the program rather than about SOC 2.

Building the estimate

A workable approach:

  1. Confirm with the customer whether Type I or Type II is required, and by when.
  2. Get the scope decided before requesting quotes, so the quotes are comparable.
  3. Request audit fee quotes from two or three independent CPA firms.
  4. Price the readiness path: internal, project consultant, or ongoing partner.
  5. Add platform costs if you are buying or already paying for one.
  6. Estimate internal hours honestly, then add a margin, because the first estimate is always low.
  7. Budget for the following year's operating cost, not just this year's report.

We do not publish universal SOC 2 price ranges, because the useful ones do not exist and the published ones tend to describe someone else's company. What we will do is scope your situation and tell you what the path looks like.

Questions

Why will not anyone give me a straight number?
Because scope drives cost, and scope is not knowable before a conversation about your systems, your customers, and what already exists. A firm number quoted before that conversation is a guess with a decimal point.
Is compliance software cheaper than an outsourced team?
They are different purchases rather than competing ones. Software is generally the smaller line item and does not carry the work. Comparing the two on price alone usually means one of them is being misunderstood.
Can we do SOC 2 entirely in-house?
Yes, if you have the internal capacity and someone with the experience to lead it. Count the internal effort honestly before deciding, because that is the category most in-house plans underestimate.
Does the audit fee include readiness work?
No. The examination is performed by an independent licensed CPA firm, which must maintain independence and cannot assume management responsibility for the controls it examines. Readiness and examination are scoped as separate engagements.
Will year two cost less?
It should, provided the program kept running. If controls lapsed after the first report, much of the readiness work repeats and the savings disappear.

Next step

Cost follows scope. See how we approach SOC 2 readiness, or tell us your situation and we will tell you what it realistically takes.

Compliance needs an owner.

When the reading is done and the work still has no home, that is the conversation to have.